High grade stainless steel, double walled, insulated, resists condensate, UL-103 sixth edition certified, corrosion resistant, pre-piped and disassembled awaiting reassembly upon delivery by contractor. Flue assembly per boiler comes with barometric dampener, through wall thimble, tee with cleanout, wall support, 12 feet of vertical stack, wall band support, roof braces, round top and spark arrester.
CONSTRUCTION OF FOUNDATION
Pre-prepared by contractor or third party.
DELIVERY AND RECEIPT OF ENERGY BOX
Unloading and placement of the Energy Box is the responsibility of the contractor or third party.
THE ENERGY BOX IS ELECTRICALLY PREINSTALLED
In the entrance area is a 120V service power socket. Fluorescent lighting is installed on the ceiling of the container.
An emergency shut-off switch is located inside the Energy Box near the entrance door. The emergency shut-off cuts the power supply to the boilers. The interior lighting continues to work for security reasons. Each Boiler has its own 220v 20amp circuit breaker.
Note: Pelletronic Online is available at additional cost.
TO BE PROVIDED ON SITE BY CONTRACTOR OR THIRD PARTY:
PLANNING OF THE ENERGY BOX TYPE D
Note : When planning for the installation of the Energy Box please follow all local and federal building codes, and emissions requirements.
The foundation for the Energy Box must be frost-resistant. Your installers will work with you to determine the best location for the Energy Box. In the connection location you will need the following connections and conduits :